No drawing, bolt schedule, or NC file ever leaves our delivery hub without progressing through five independent engineering validation gates.
Detailed structural contract document review, RFP scope breakdown, preliminary material estimating (MTO), and execution milestone alignment before kickoff.
Primary member geometry modeled directly against contract architectural, civil, and structural design drawings in SDS/2 and Tekla Structures.
Detailers configure shop assembly sheets, erection layouts, piece marks, weld symbols, and automated NC DSTV files.
Senior checkers with 15+ years of steel shop experience independently back-check every dimension and detail against contract plans.
Final audit by the Squad Leader and licensed Professional Engineer, verifying all RFI responses and sealing connection calculations.
Structured milestones that keep your fabrication shop ahead of critical path erection schedules.
Kick-off & RFI 01: Contract plan ingestion, model setup, and initial design query logs sent.
Advance BOM: Complete preliminary material requisition issued for early mill ordering.
Anchor Bolt Release: Foundation embeds and anchor bolt setting plans issued for concrete pour.
Approval Package: 3D stick model, E-Plans, and connection calcs submitted for EOR review.
Fabrication Release: Complete 16 turnkey deliverables released phased to shop schedule.
Let us show you how our 5-tier QC protocol eliminates field re-drilling and fabrication backcharges on your next steel project.